radomes.openskiesproject.org
nikoh2003 nikoh2003
  • 16-03-2017
  • Mathematics
Answered

A construction crew has jsut built a new road. The built the road at a rate of 5 kilometers per week. They built 156.25 kilometers of road. How many weeks did it take them?

Verified Answer :

jakemcmtwitter jakemcmtwitter
  • 16-03-2017

31.25 weeks to build.

Answer Link

Related Questions

Fitness can be achieved only through A accuracy B resistance C frequency D endurance
In comparison to eukaryotes prokaryotes
Is it true that the set of integers is a subset of the set of whole numbers
What was the african contribution to the columbian exchange
Who was the first under the british to cross the atlantic henry hudson leif erikson sir walter raleigh john cabot
In ancient times plant and animal remains got buried compressed and transformed into fossil fuels like coal Burning of these fossil fuels today will affect whic
The theory of plate tectonics states that the Earths crust is composed of many plates that move gradually across the Earths surface Please select the best answe
What is the conjugate base of ch3ch2co2h
Until the 1900s what civilization was thought to be the parent culture of Mesoamerica Maya Aztec Olmec San Lorenzo
can somone give me the answer to 2 x 0