A construction crew has just built a new road. it took them 7 weeks to build 8.75 kilometers of road. at what rate did they build the road?

Verified Answer :

Anonymous Anonymous
  • 16-01-2017

7 weeks = 8.75

1 week = x

where x is the kilometers of road built in a week

Proportion:

8.75/7 = x/1

7x=8.75

x=1.25

Answer Link

Related Questions

The most practical way to avoid mismanagement of a checking account is a to not have one in the first place b have someone doublecheck your addition in the regi
Is the function represented by the table linear x y 10 6 11 1 12 6 13 12 Yes because it has a constant rate of change Yes because it does not have a constant ra
Which trinomial is equivalent to 3x22 2x1
may you please write me a short answer about the context reasons and aftereffects of the nuclear bomb
when answering essay questions the main idea of your essay
Solve 3x672xPlease and thank you
What are fissures within the lungswalls of tissue that separate parts of the lungsmuscles that surround the lungs and facilitatebreathingO the points where oxyg
A recipe for making 3 dozen muffins requires 15 cups of flour At this rate how many cups of flour are required to make 5 dozen muffins
A person who hasnt smoked for two hours and is irritable is showing symptoms of AHunger Brespiration Cwithdrawal Daddiction pick two
This isosceles triangle has two sides of equal length a that are longer than the length of the base b The perimeter of the triangle is 157 centimeters The equat