4 bags of cement do 18m2 how many m2 can be done with 7 bags

Verified Answer :

Anonymous Anonymous
  • 24-01-2016

We will represent the word bags with the letter b and the unknown with x

4b = 18m²
7b =   xm²

To work this out, we will first have to work out how many m² one bag will cover.
We know that 4b = 18m²
To get from 4b to b, we must divide by 4
Therefore to get from 18 to the missing value, we must divide by 4
18/4 = 4.5m²

Now we must work out how to get from 1 bag to 7 bags
We multiply by 7
Therefore we do the same to 4.5m²
4.5 x 7 = 31.5m²

Answer Link

Related Questions

What is ferocious cruelty by Randall Collins
Ideas spread to influence public opinion for or against a cause A Reparations B Propaganda C Lusitania D Rhineland
Multiple choice questions for which usually only two responses are given such as yes no male female is termed as
What are 5 words that discribe the wright brothers
How did a new movement within Judaism lead to the development of a new faith
Write a decimal in tenths that is less than 381 but greater than 30
what is the critical object in a story
RAtional expressions 2w286 w1
Trina wants to hangglide at the same number of meters above sea level as she scubadived below sea levelwill she fly higher than Jessie didExplain
what number is it the difference of 9 and three times equals 69 find the number