radomes.openskiesproject.org
dommanigo10 dommanigo10
  • 17-07-2014
  • Physics
Answered

A crane does 62,500 joules of work to lift a boulder a distance of 25.0 meters. How much did the boulder weight

Verified Answer :

AL2006
AL2006 AL2006
  • 17-07-2014

Work = (force) x (distance)

62,500 joules = (boulder's weight) x (25 meters)

Divide each side by (25 meters) :

Boulder's weight = (62,500 joules) / (25 meters) = 2,500 newtons

That's about 562 pounds.

Answer Link

Related Questions

Read the following passage and answer the question below La familia Smith va de vacaciones de verano a México Ellos empacan pack su ropa en la maleta pero antes
Find the surface area of a square pyramid with a base length of 24 cm and a height of 16 cm Answers 1056 cm2 1536 cm2 816 cm2 1344 cm2 Can you explain step by s
Which of the following areas of criminalistics is the LEAST reliable a Hair analysis b DNA testing c Ballistics testing d Fingerprint analysis
the term judicial review refers to the power of
15 of what number is 12
is 1 rational or irrational
Which of the following is defined as the movement of individuals to and from a populationO CompositionDistributionO DynamicsO MigrationQuestion 20Multiple Choic
Which two microscopes generate threedimensional images scanning electron microscope and scanning tunneling microscope transmission electron microscope and scann
How do you change a fraction into a decimal
Can impeach the president