radomes.openskiesproject.org
jjhjfj
jjhjfj jjhjfj
  • 14-12-2015
  • Mathematics
Answered

A contractors crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Verified Answer :

nmatiska nmatiska
  • 14-12-2015

This equates to the division problem 54/3, which is equal to 18.
It would take them 18 weeks to frame all 54 houses.

Answer Link
Rainbowcloudycupcake
Rainbowcloudycupcake Rainbowcloudycupcake
  • 14-12-2015

18 weeks to frame 54 houses hope that helps

Answer Link

Related Questions

Compounds that are formed when two or more atoms combine to form molecules are called
If DEF is an isosceles triangle with base what is the measure of F
Katrina and Amanda are studying the same class On Monday Katrina solved 35 math problems and Amanda solved 21 math problems On Wednesday Katrina solved 16 math
42d4d Help I need to finish this homework
What is the percentage composition of CF4
Why is the notion of ethics particularly important in the criminal justice system
solve for the variable yx735
The first term in a sequence is xeach subsequent term is 3 less than twice the preceeding termwhat is fifth term of the sequence
Write each group of words that is a sentence Places the flowerpot in the sun
What is negative 009 repeating as a fraction