If ten worker complete a work in 20 days how many workers are required to complete same work in 15 days

Verified Answer :

isaac254971 isaac254971
  • 26-05-2024

Answer:

7

Step-by-step explanation:

Answer Link

Related Questions

Which of the following are you not likely to find on a historical map of World War II
as magma rises toward the surfaces what happens to the gases in it Why
Find the area of the shaded region A 36 square units B 32 square units C 17 square units D 16 square units
A cable cord is 78 meters longWorkers cut it into 30 pieces of equal length How many centimeters long is each piece
Find the ratio in simplest form 4 weeks 7 days
Calculate the length of the circumference of a circle with diameter of 104
can you please help me with this 4523
what is limit of fx x32x29x4x22x8 as x approaches 4
Hows have the dead sea scrolls affected judaism
Read the passage about bird food and bird watching Noted scientist Dr Elsa Birde described the effect of adding a mixture of dried apples and raisins to the pre