radomes.openskiesproject.org
tmcfall84
tmcfall84 tmcfall84
  • 27-02-2017
  • Mathematics
Answered

There are 45 employees who each put in 97 hours on a project what are the total number of hours worked on the project

Verified Answer :

sami30 sami30
  • 27-02-2017

45x97=4365 hours, number of hours multiply by n of enmp

Answer Link
successwithteresa18
successwithteresa18 successwithteresa18
  • 15-06-2021

Answer:

The correct answer is 4,365

Answer Link

Related Questions

What are particles of carbon otherwise known as and what kind of pollution do they cause
taylor quan and india each have a bag that weighs 4 kilograms how many kilograms do their book bags weigh in all
Jessica stands 150 feet from the base of a tall building She measures the angle from her eye to the top of the building to e 84 degrees If her eye level is 5 fe
The sum of a number and its square is 42 Which equation can be used to find the two numbers for which this is true
Factor 8x3 2x2 12x 3 by grouping What is the resulting expression A 2x2 34x 1 b 2x2 34x 1 c 2x2 34x 1 d 2x2 34x 1
what two layers make it difficult for materials to pass through the cell membrane
How do temperature a d salinity affect deep water currents A They create changes in wind direction moving denser water in the same direction as the wind and cau
write the composite function that represents goFx
What is another name for the first 10 amendments to the Constitution
essica was asked to hang six student paintings in a row on the wall How many different ways could she arrange them