radomes.openskiesproject.org
naomioprea14
naomioprea14 naomioprea14
  • 27-02-2017
  • Mathematics
Answered

A manager has 2500kg of sand delivered to a construction site every day.

about how many tons of sand does he have delivered to the site after 4 weeks.

A2.5 tons
B19.3 tons
C77.2 tons
D324,000 tons

Verified Answer :

captaincleanfreak
captaincleanfreak captaincleanfreak
  • 28-02-2017

C 77.2 tons for four weeks

Answer Link

Related Questions

The basal metabolic rate measures the rate at which a persons body burns food and nutrient
The Panama Canal connects what two bodies of water
when is best to take bath after you jog or before
Which statement best describes the idea of the law of supply
How is the underlined pronoun used in the sentence I received a fivepage letter from him in the mail yesterday a direct object b object of a preposition c indir
The product of 8 and the quantity of a number y plus 6 is less than 21
You pick one card from each set spin the spinner and find the sum How many different sums are possible 2 3 4 3 4 5 678
what is the maximum number of f orbitals in any single energy level in an atom
18 is 75 percent of what number
What are the characteristics of a successful business manwoman