A manager has 2500kg of sand delivered to a construction site every day.
about how many tons of sand does he have delivered to the site after 4 weeks.
A2.5 tons
B19.3 tons
C77.2 tons
D324,000 tons
about how many tons of sand does he have delivered to the site after 4 weeks.
A2.5 tons
B19.3 tons
C77.2 tons
D324,000 tons