radomes.openskiesproject.org
mohsinabanu mohsinabanu
  • 22-02-2017
  • Mathematics
Answered

20 men can complete the construction of a road in 30 days. If 5 more men join the team,In how many days will the work be over?

Verified Answer :

ashlipi57 ashlipi57
  • 22-02-2017

Technically since the road is already built, it wouldnt take any more days. But if they are starting over at the beginning with 25 men, it would take them about 25 days

Answer Link

Related Questions

Which of the following are steps in preparing to write a research paper Select all that apply pick a limited topic proofread brainstorm prepare a working outlin
which process would most effectively separate two liquids with different boiling poins
A bad thesis produces all of the following effects on readers EXCEPT Points 1 preventing writers from thinking carefully about evidence allowing writers to rush
what would happen if you were given pure water in an IV
The lungs take from outside of the body and put it to work inside the body
An example of brinkmanship is found in A the Cuban Missile Crisis B the ArabIsraeli War C the IranIraq War D the Cultural Revolution E the Korean War
The three stages in the development of a full tropical cyclone are formative mature and A tropical cyclone B dissipation C tornado D damage
While Ralph and Jack are fighting Piggy says to Ralph Remember what we came for The fire My specs Piggy reminds Ralph to protect him because Piggy is extremely
The width of a certain rectangle is 75 of its length The perimeter of the rectangle is 148 centimeters What are the dimensions of the rectangle
what snakes can i find in my backyard in georgia