At a construction site, the site manager notices that a crane takes 20 seconds to lift a 500kg steel beam up to a height of 15 meters. From this information, he calculates the power output of the crane to be what value?

Verified Answer :

scme1702
scme1702 scme1702
  • 23-02-2017

The work done is equal to the change in potential energy which is:
P.E = mgh
P.E = 500 x 9.81 x 15
P.E = 73,575 J

Power = work / time
Power = 73,575 / 20
Power = 3,700 Watts

Answer Link

Related Questions

What form of discrimination most directly affected mexican americans
Whats the value of 5y if 23y54
Which of the following is NOT a characteristic of an inner planet A rocky B solid surface C near the sun D made mostly of gas
The or false all factors that influence our physical fitness can be controlled
States that momentum cannot be created or destroyed
ACTIVITY 1 INTRODUCTION1 Define the term human rights violations and suggest THREE ways in which wars canlead to human rights violations13 42 Give the meaning o
what step was taken by the federal government to protect Texas settlers from Native American raids in the middle 1800s
Help on both of the problems plzzzz
Vector $u$ has a magnitude of 5 units and a direction angle of $75^{\circ}$, and vector $v$ has a magnitude of 6 units and a direction angle of $210^{\circ}$. W
All scientists observing the same event will record identical descriptions