radomes.openskiesproject.org
markiaa15 markiaa15
  • 10-02-2017
  • Mathematics
Answered

A construction crew has just built a new road. They built 8.75 kilometers of road at a rate of 7 kilometers per week. How many weeks did it take them?

Verified Answer :

Superstudent2744
Superstudent2744 Superstudent2744
  • 10-02-2017

it took them 2 weeks

Answer Link

Related Questions

what are five types of dance
carly bought a new house for 125000 the value of the house appreciates approximately 35 each year what will be the value of the house after 10 years
what letter is used to represent the slope in the formula ymxb
Which of the following is not included when analyzing for structure A how the sentences are written B what order the information is organized C the specific fac
volenteers at an animal shelter divide 132 pounds of dry dog food equally into 16 bags how many pounds of dog food did they put in each bag
which answer best describes the verb tenses in the sentence While my farther works outside my mother usually prepares dinner for the family
Point A and point B have been plotted on a centimetre square grid Point A has coordinates 2 1 and point B has coordinates 49 as shown below Using Pythagoras the
1510 as a mixed number
assets that arent expected to provide benefits for a number of accounting periods are called what
another term for multiple meaning words is