radomes.openskiesproject.org
Anonymous Anonymous
  • 07-02-2017
  • Mathematics
Answered

An experienced carpenter could build a house in 4 days. How much would he have if he worked for 2 days?

Verified Answer :

kinseydaviscorr
kinseydaviscorr kinseydaviscorr
  • 07-02-2017

he would have half a house

Answer Link
Anonymous Anonymous
  • 07-02-2017

he would have built half of a house

Hope this helps!

Answer Link

Related Questions

What is the answer to 5x1x15
if you dont no the answer for sure please dont answee
What causes headaches in the back of the head
What is the solution of the equation 6x 3 5x 5 A 4 B 2 C 0 D 1
write an expression to represent the quotient
How many tenths are in 5
what is ecological impact assessment
The ratio of Bills money to Henrys money was 5 6 After Bill spent 800 on a TV set the ratio became 1 2 How much money did Henry have
Which of the following is a way that climate affects soil formation a increased precipitation b warmer temperatures c increased winds d all of the above
Carl has three lengths of cable 56 yard long 14 yard long and 23 yard long after Carl has used 1 yard of cable how much cable will he have left