radomes.openskiesproject.org
ari2003 ari2003
  • 07-02-2017
  • Mathematics
Answered

if 6 workers can build 4 cars in 2 days then how many days would it take 8 workers to build 6 cars?

Verified Answer :

righttwix
righttwix righttwix
  • 07-02-2017

so its this: 6(2) over 4 gives you 3 cars per man day. 8(d)=6(3). 8(d)=18. 18 divided by 8 gives you 2.25. so it takes 2.25 days

Answer Link

Related Questions

One week 72 people got a speeding ticket The next week only 36 people got a speeding ticket What a the percent of change in speeding tickets Please explain
How do chemoautotrophs make energy They covert carbon dioxide water and sunlight into carbohydrates They convert carbon dioxide water and organic molecules to c
A container holds 3g of argon at a pressure of 8 atmHow much heat is required to increase the temperature by 100 degrees at constant pressure
Anis anthat has been modified so that it is more usefuAindustry ideaBidea industryCinnovation inventionD invention innovationPlease select the best answer from
how are vaccines realated to memory cells
an earthquake is a violent shaking of the earth surfacewhere are earthquake common
which type of investment typically charges the investor the lowest fees
How would you sole this equation if you were solving for x 6x2x723
Which is the best correction of the clause fragment The book that he borrowed last week from me a Change that to which b Delete from me c Move last week to the
How do farmers prevent wind erosion of topsoil