a man 80kg carries a load of bricks of mass 20kg up a vertical ladder of length 6m what work has he done

Verified Answer :

atuftofwisps
atuftofwisps atuftofwisps
  • 07-01-2017

define what you mean by work

Answer Link
tochukwupeter609
tochukwupeter609 tochukwupeter609
  • 23-08-2021

Answer:

80kg+20kg×10×6=1006J

Explanation:

sum of the mass of the body and that of the object will give you the total mass, then multiple with the acceleration due to gravity which is 10m/s^2,after that multiple with the distance

given that work done =FXd

Answer Link

Related Questions

40 Points Instructions Drag the tiles to the correct boxes to complete the pairs Not all tiles will be used ABCDEFGHIJ is a regular decagon It rotates clockwise
What is 13 times 1 13
Which fraction is bigger 78 or 1920
Which of the following is not an accurate description of chemical reactions
si el 12 es 123 cuanto es el 100
Help plz with correct answer
mark said that the number 005 has a value 10 times greater than 05 is he correct
This body has control when a society has popular sovereignty a the aristocracy c the wealthy b the army d the people
In circle O BC 18 and DC 42 The diagram is not drawn to scale What is the length of diameter BA Round the answer to the nearest tenth
How can math tools help you detect errors or inaccuracies in data