It took 5 hours to mow 4 lawns. At that rate, how long would it take to mow 7 lawns?
The time taken to mow 7 lawns at the same rate it takes to mow 4 lawns is 8.75 hours
Speed is the distance travelled per unit. Mathematically, it can be expressed as:
Speed = distance / time
With the above concept, we shall determine time to mow 7 lawns as follow:
Rate = Lawn / time
Rate = 4 / 5
Rate = 0.8 lawn/hour
Rate = Lawn / time
0.8 = 7 / time
Cross multiply
0.8 × time = 7
Divide both side by 0.8
Time = 7 / 0.8
Time = 8.75 hours
Learn more about speed:
https://brainly.com/question/680492