radomes.openskiesproject.org
TyreeSerini163 TyreeSerini163
  • 23-03-2014
  • Mathematics
Answered

Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Verified Answer :

madankapoor10
madankapoor10 madankapoor10
  • 23-03-2014

1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Related Questions

which observation proves that a cell is a eukaryote
find the slope of the line passing through the points 3 8 and 2 5 3 35 13
How do you think different groups of people in Singapore were affected by the Japanese Occupation
How is an autobiography such as A White house Diary different from a biography A It tells about the writers life B it tells about the life of a real person C it
what colors are birds are attracted 2
He three types of seismic waves produced by an earthquake are primary secondary and a sedimentary b atmospheric c surface d elastic
Certain nutrients are mandatory on the USDA nutrition facts label unless the nutrients
The society in which Zekle and Huldy from the poem The Courtin lived was
Sunlight provides for plants
Complete the following equation using lt gt or 57 1