radomes.openskiesproject.org
Anonymous Anonymous
  • 22-08-2016
  • Mathematics
Answered

Alonso runs a company called Speedy Houses Painters. His workers can paint 3/4 of a house in one day. How many days would it take them to paint 6 houses?

Verified Answer :

YosairiBeltran
YosairiBeltran YosairiBeltran
  • 22-08-2016

Divide 3/4 =75
Take that 75 multiply by 6
75•6=450

Answer Link

Related Questions

what is the word name for 0941
In general the of a simple machine is the ratio of the distance over which the force is applied to the distance over which the load is moved
which one of these numbers is not like the other 2516496381
Consuelos living room is the shape of a rectangle and has an area of 360 square feet the widith of the living room is 58 its length what is the length of the li
Individuals have a stronger voice in public policy when they 4 points
Find the perimeter of the kite below Give your answer in its simplest form with any brackets expanded
Draw the structural formula for CHCHCHCHCHCHCHCHCH
Solve this using elimination method 5x25y60 3x15y42
Lets say you have a box and that box is completely isolated Inside this box there are 100 pieces of ice each piece has a mass of 50g The box also has a temperat
TRIGONOMETRIC RATIOS A ship is 130m away from the center of a barrier that measures 180m from end to end What is the minimum angle that the boat must be turned