radomes.openskiesproject.org
svnnynight
svnnynight svnnynight
  • 07-06-2016
  • Mathematics
Answered

Which one is the correct answer

Which one is the correct answer class=

Verified Answer :

apologiabiology
apologiabiology apologiabiology
  • 07-06-2016

jim can do the 1/2 of floor in 4 hours
pete completes 1/2 of floor in 2 hour

therefor, since, pete took 1/2 as much time, pete can tile 2 times as many tiles (logic)

pete can lay 25 more than jim
if pete is 2 times of jim
p=2j
and pete is 25 more than jim
p=25+j
2j=p=25+j
2j=25+j
minus j
j=25

jim lays at 25 tiles per hour
C is answer

Answer Link

Related Questions

what was the us policy that committed American Aid in troops to protect the Middle East from communist aggression a brinkmanship B Containment C Eisenhower Doct
People have classified plants and animals for thousands of years a True b False
Click an item in the list or group of pictures at the bottom of the problem and holding the button down drag it into the correct position in the answer box Rele
300 is greater than 30 explain using rounding
tex intlimits 3 fracx2 dx tex
Select the items for which the discount is greater than 15circle all that apply Plz show me work A2995 box set of CDs on sale for 1995 B6449 pair of shoes on sa
Which is the tallest mountain peak in Africa A Mount Kilimanjaro B Mount Fuji C Mount Cameroon D Mount Everest
In a command economy the majority of goods and services are provided by the a state c individual b church d surrounding nations
Roger walked to 12 kilometer from his home to the park Then he walked 200 meters in the park and walked home How far did he walk in meters
what did Egyptians mean by the afterlife