from my homework
a small manufacturing plant makes three types of inflatabl boats: one-person, two-person, and 4 person models. each boa requires the services of three departments as listed in the tabble. the cutting, assemply, and packaging depepartments have available a masimum of 380,330, and 120 labor-hours per week respectively.
table
collumns are one person, 2 person, 4 person respectivly
rows
cutting 0.5hours 1hour 1.5hour
assembly 0.6hours 0.9hour 1.2hour
packaging 0.2hour 0.3hour 0.5hour
Ahow many boats of each type ust be produced each week for the plant to operate at full capacity?
BHow is the production schedule in part A affected if the packaging department is no longer used?
CHow is the production schedule in part A affected if the 4 person boat is no longer produced?
(use gauss-jordan elimination when possible and show all work and reasoning)
a small manufacturing plant makes three types of inflatabl boats: one-person, two-person, and 4 person models. each boa requires the services of three departments as listed in the tabble. the cutting, assemply, and packaging depepartments have available a masimum of 380,330, and 120 labor-hours per week respectively.
table
collumns are one person, 2 person, 4 person respectivly
rows
cutting 0.5hours 1hour 1.5hour
assembly 0.6hours 0.9hour 1.2hour
packaging 0.2hour 0.3hour 0.5hour
Ahow many boats of each type ust be produced each week for the plant to operate at full capacity?
BHow is the production schedule in part A affected if the packaging department is no longer used?
CHow is the production schedule in part A affected if the 4 person boat is no longer produced?