what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Verified Answer :

kelpel197
kelpel197 kelpel197
  • 04-04-2016

So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.

Answer Link

Related Questions

23 Which term identifies the halfreaction that occurs at the anode of an operating electrochemical cell 1 oxidation 3 neutralization 2 reduction 4 transmutation
How would Europes climate change if the North Atlantic Current disappeared
5 questions Please help 1 Which expression is equal to 2xx2 x3x5 2 Which expression is equal to c246c415c3c24c412c330c2 3 Which expression is equal to 3xx3 x2x
fxx3ax2bx3 where a and b are constants bx Given that when f x is divided by x2 the remainder is 7 a show that 2ab6 Given also that when f x is divided by x1 the
Who makes up the presidents cabinet A the presidents family members B the majority members of the Senate and House of Representatives C the vice president heads
What is the name of the most important topmost stone in an archwedge stone keystonemortarO beam
Convert 830 grams of silver into moles
To define a picture plane a twodimensional artist must establish a the borders of the artwork b specific atmospheric perspective c a vanishing point and horizon
If AXXB as ABAC find the missing length AX 5 XB 4 AC 6 find AB 245 103 152
What are the names of all the new England colonies