radomes.openskiesproject.org
kiyleearmstrong kiyleearmstrong
  • 28-03-2016
  • Mathematics
Answered

city workers are paving a street that is 1 1/2 miles long. if they repave 1/4 mile per day, how long will it take to repave the entire street?

Verified Answer :

zerofrancisco zerofrancisco
  • 28-03-2016

the question is to find out how many times 1/4 is equal to 1 1/2
First lets convert the total:
1 1/2 = 2/2 + 1/2 = 3/2
now we need to find out a number that multiplied by 1/4 gives 3/2, that is an equation:
(1/4)x = 3/2
and solving for x:
x = (3/2)*4
x = 12/2
x = 6
therefore they will take 6 days to repave the whole street

Answer Link

Related Questions

1 What reasons did the members of the Constitutional Convention have for creating the Electoral College Use examples from your research to support your answer 2
I need help I dont have any clue what to do on it and was wondering if I could get some help
300 is 5 of what number
People often release their pets into the wild when they become too big to handle a True b False
I cant understand this
What features characterized kafkas early writing
Math Help Please explain the questions How long will it take for the balance of an account to double if the savings account earns 075 annual interest compounded
Discuss the theoretical principles and emerging trends in the design and optimization of renewable energy systems such as wind turbines solar collectors and tid
what percentage of the source energy from question 1a is absorbed by the oak in model 1
What Nationality was Henry Hudson